• Skyline Reconstruction Information - May 2017

     
    The timeline for rebuilding the Skyline campus is as follows.
     
    Timeline  
     
    This aerial photo shows the existing Skyline campus.
     
    Current Campus  
     
    This graphic shows the outline of the new campus overlaid on the existing campus.
     
    Overlay  
     
    Here is the overhead view of the new Skyline campus.  
     
    New Campus 1  
     
    The new campus will be two stories across the front and one story in the rear, as shown in this side elevation.
     
    Side View  
     
    These images show the campus as viewed from Lomas Santa Fe.
     
    New Campus 3  
     
    The new campus will be ready for occupancy in fall 2018. 
     
    New Campus 4