Skyline Reconstruction Information - May 2017
The timeline for rebuilding the Skyline campus is as follows.
This aerial photo shows the existing Skyline campus.
This graphic shows the outline of the new campus overlaid on the existing campus.
Here is the overhead view of the new Skyline campus.
The new campus will be two stories across the front and one story in the rear, as shown in this side elevation.
These images show the campus as viewed from Lomas Santa Fe.
The new campus will be ready for occupancy in fall 2018.