Solana Vista Reconstruction Progress Photos

Solana Vista Reconstruction Drone Photos - January 2021

DJI_0623
DJI_0624
DJI_0625
DJI_0629
DJI_0630
DJI_0631
DJI_0632
DJI_0636

Solana Vista Reconstruction Progress Photos - January 2021

B124 Room 18 South Wall
Building A Stucco in Progress
Front Site Wall
Media Center Bldg B Lath Plaster Activities Beginning
Bldg B Being Prepped for Lath and Plaster
Door Frames and Paper Installed Bldg B
Drywall and MEP Installation in Bldg B Corridor
Exterior Of Kinder Room 2
East Side of Kinder Wing from Hillside
Stucco In Progress Bldg A

Solana Vista Reconstruction Progress Photos - February 2021

Building B3 Brown Coat
Corridor Store Front Between Room 16 and Media Center
Admin Drywall and Insulation in Progress
Front Retaining Wall in Progress
Media Center Teching Wall
Media Center South Wall
Student Kitchen Entrance
Admin Drywall Complete 2021.02.25
Building A Boys RR A109 Tile Complete Grout in Progress 2021.02.25
Building A Rock Veneer Complete and Exterior Painting in Progress
Building B Area B1 Lath Complete 2021.02.25
Building B Area B3 Color Coat Complete 2021.02.25
Corridor B131 Drywall HVAC Insulation Progress 2021.02.25
Exterior
Front Retaining Wall Completed and Backfill in Progress 2021.02.25
Lunch Shelter Stone Veneer Complete 2021.02.25
MPR Entrance Building A Veneer Complete and Paint In Progress

Solana Vista Reconstruction Progress Photos - March 2021

B3 Outside Room 18 19 HM Frames Painted 2021.03.05
Building A Boys RR Tile and Flooring Installed 2021.03.05
Classroom Corridor in B3 - Accent Paint 2021.03.05
Exit Ramp Cut and Curbs Formed and Being Poured 2021.03.05
Gutter and Metal Fascia being Installed at Building A 2021.03.05
Media Center Drywall Installation Complete 2021.03.05
Painted Exterior and Frames and Windows Installed at Child Nutrition 2021.03.05
Admin Progress 2021.03.12
B2 Corridor Glazing Paint TBar 2021.03.12
Boys RR B120 Tile Installation in Progress2 2021.03.12
Fascia at Lunch Shelter Complete 2021.03.12
Exterior Color Coat B2 2021.03.12
View from Santa Domingo - 5 - 2021.03.12
Building B3 Classroom Corridor T-Bar and Ballasts 2021.03.26
Casework at South Wall Music Room 2021.03.26
Classroom 23 B111 S Wall Case Work Installation 2021.03.26
Doors Installed at Child Nutrition 2021.03.26
Plastic and Tape Removed Ready for Glazing Media Center 2021.03.26
Roll-up Door Installed at MPR 2021.03.26
Roof Installation Building B in Progress 2021.03.26
Stone Veneer at Admin In Progress 2021.03.26

Solana Vista Reconstruction Progress Photos - April 2021

B124 Room 18 South Wall
Building A Stucco in Progress
Front Site Wall
Bldg B Being Prepped for Lath and Plaster
Drywall and MEP Installation in Bldg B Corridor
Door Frames and Paper Installed Bldg B
East Side of Kinder Wing from Hillside
Exterior Of Kinder Room 2
Stucco In Progress Bldg A
Media Center Bldg B Lath Plaster Activities Beginning
Casework Installation at Classrooms_3 2021.04.02
Admin Recepiton Area Drywall and Framing 2021.04.02
Casework Installation at Classrooms_4 2021.04.02
Color Coat Building B2 and B1 Almost Complete 2021.04.02
Doors Intalled and Painted Exterior Lights Intalled at CN
Exterior of Media Center 2021.04.02
Standing Seam Roof at Bldg B3 2021.04.02
Stone Veneer Outside Admin Complete 2021.04.02
Stone Veneer Outside Media Cneter Complete 2021.04.02
Admin Desk with Cut out 2021.04.09
Ball Wall CMU in Progress 2021.04.09
Casework Installation at Teachers Workroom in Progress  2021.04.09
Electrical Panels Installed in SDGE Room 2021.04.09
Fine Grade in Between A and B3 2021.04.09
Sinks Installed at Building A Boys RR 2021.04.09
Sinks Installed at Building A Girls RR 2021.04.09
Staff Lounge 1 2021.04.09
Staff Lounge 2 2021.04.09
Toilets and Urinals Installed at Building A Boys RR 2021.04.09
Stone Veneet at B2A in Progress 2021.04.09
Toilets Installed at Buidling A Girls RR 2021.04.09
Trash Enclosure CMU Installation 2021.04.09

Solana Vista Reconstruction Progress Photos - May 2021

Extrior View of Steel Beams Painted in Media Center 2021.05.07
Accent Paint In Kinder Wing 2021.05.07
Flatwork Concrete Poured Between A and B 2021.05.07
Interior View of Painted Steel in Media Center 2021.05.07
Flooring Complete at Student Nutrition 2021.05.07
Theatrical Light Bar Installed in Front of MPR Stage 2021.05.07
Casework Installation in Student Kitchen 01 - 2021.04.16
Casework In Staff Workroom Installed 03-2021.04.16
Seamless Roof and Fascia Installed at High Roof of Admin 2021.04.16
Sidewalk and Planter Framing in Front of A 2021.04.16
Stone Veneer In progress at South Side of Kinder 2021.04.16
Student Nutrition Progress 2021.04.16
Tile Complete at Student RR B3 2021.04.16
Casework Insallation at Staff Lounge 2021.05.14
Casework Installation at Health Office 2021.05.14
Flatwork Pour at Lunch Shelter Area 2021.05.14
Seating Walls Behind Lunch Area 2021.05.14
Casework at Staff Lounge 2021.05.21
Admin Storefront Framed 2021.05.21
84 Inch Quercus Virginiana Placed in Front Of Admin 2021.05.21
Health Office Floor Prepped for Flooring 2021.05.21
Lunch Shelter Flatwork Complete 2021.05.21
Playground Grading In Progress 2021.05.21
Rack Installation at MD-F Room 2021.05.21
Sidewalk Poured Outside B2 Classrooms Poured 2021.05.21
Trees Placed in Front of Building A Side Entrance 2021.05.21
Trees Placed in Kinder Play Area 2021.05.21